Exhibit G: 2014 Professional Fee Schedule
Hourly Rates:
Principal Engineer/Surveyor Senior Manager Engineer, P.E or Surveying, P.L.S Senior Manager Design/Operations Project Manager, P.E. or P.L.S. Project Manager (Grad Engineer or equivalent and E.I.T/S.I.T) Project Manager (Grad Engineer or equivalent or E.I.T/S.I.T) Engineering Intern Senior Supervisor Design/Survey Supervisor Design/Survey Design/Survey Technician (Grad BA or BS)* Design/Survey Technician Design/Survey Assistant Technical Assistant/Administrative Assistant Business Manager/Controller (Grad BS) Business/Accounting Manager (Grad BA or BS) Bookkeeper RTK Survey Equipment (GPS) RTK Survey Equipment w/2 rovers Robotic Survey Equipment Total Station Survey Equipment Machine Traffic Counter REIMBURSABLES: |
………………………………..$130.00 ………………………………..$115.00 ………………………………..$100.00 ………………………………..$105.00 ………………………………..$95.00 ………………………………..$85.00 ………………………………..$62.00 ………………………………..$80.00 ………………………………..$70.00 ………………………………..$64.00 ………………………………..$58.00 ………………………………..$53.00 ………………………………..$40.00 ………………………………..$90.00 ………………………………..$72.00 ………………………………..$50.00 ………………………………..$33.00 ………………………………..$47.00 ………………………………..$30.00 ………………………………..$20.00 ………………………………..$50.00/2 Days |
* In related field
- Billable hours are based on portal to portal time.
- Overtime and Expert Witness Arbitration is billed at a rate 1.5 times the above base rate.
- Normal overhead expenses (e.g. local mileage) are included in the above hourly rates. Other expenses will be billed at direct cost, i.e. reproduction, outside services, special equipment, etc.
- A 2% discount on Professional Services will be allowed on invoices paid within 10 days of the date of the invoice. This 2% discount is limited to our Professional Services.
- Service Fees, since we do not mark-up our reimbursable expenses or municipal fees.